+2
Voting

Change order/spacing of buttons in iRidium Log

Jackie Roos 10 jaar geleden in i2 Control V2.2 bijgewerkt door Oksana (expert) 10 jaar geleden 2

Hi

Can we please change the order and add some spacing to the buttons in iRidium log as it is very easy to press on clear rather than save:


Change from

Image 10005


to something like

Image 10006


thanks